Status Indicators for Most Recently Reported Results: On Target | Caution | Below Plan | No Information

% of plan completed
Actual Target Results for

Goal:

Expand capacity in the Fletcher Creek Sewer Basin

30.00% 50.00% Mid-Year 2024

Definition

The City of Bartlett currently discharges a portion of the Fletcher Creek Sewer Basin to Memphis via the Santa Valley Sewer Line. As a part of the City of Memphis Sewer Study, this area will require a six-million-gallon Sewer Equalization Tank. The City of Bartlett has contracted with Barge Design Solutions to conduct a Sewer Flow Monitoring Study. This Study will allow the City to size the required tank, phase the tank construction, and ultimately spur development within this sewer basin.

Analysis

The City of Bartlett is conducting a flow study in the Fletcher Creek Sewer Basin to determine the sewer infrastructure needed to accommodate growth in this area. This project's first phase is complete, and Barge Design Solutions is now developing a formal plan to expand sewer capacity in Bartlett Industrial Park along Brother Boulevard. This addition would open up opportunities for new development and/or expansion within a mature industrial area that significantly impacts the entire region, generating approximately $8.3 billion in Gross Regional Product (GRP) annually. 

CONTACT INFORMATION
City of Bartlett
6400 Stage Road
Bartlett, TN 38134
Debbie Gelineau
[email protected]