Status Indicators for Most Recently Reported Results: On Target | Caution | Below Plan | No Information
| Actual | Target | Results for |
Goal:
Complete construction of the Moss Valley Sewer line by 2026
| 99.00% | 100.00% | Q4-25 |
Definition
The City of Bartlett, currently discharges a portion of the Fletcher Creek Sewer Basin to Memphis via the Moss Valley Sewer Line. As a part of the City of Memphis Sewer Study, it was discovered that the Moss Valley Sewer line is currently undersized. The City of Bartlett contracted with Barge Design Solutions to produce a set of Construction plans for the installation of a larger sewer replacement line. This upsized line installation will allow the City of Bartlett to spur development within this sewer sub-basin.
Analysis
The City of Bartlett has assessed sewer flows, developed a construction plan, acquired the necessary easements, completed the formal bidding process, and awarded the project to Enscor. Construction began in May 2025. Construction of the new line is complete as of mid-September 2025. Road repaving was completed by mid-October 2025. The private service line has had the cured-in-place pipe lining installed and post-installation videos are complete. The project has been completed and is awaiting final inspection and acceptance from Memphis. This critical project will unlock over 38 acres of prime real estate adjacent to the Union Depot development.

